HOME

WELCOME
Getting Started with the WA
SITE BUILT (NEAT)
WORK ORDERS
ADVANCED FEATURES
 

Ducts and Infiltration

The Ducts/Infiltration tab covers a number of key energy measurements, which can include:

  • Air and Duct Leakages
  • Optional Blower Door and Zonal Pressures
  • Optional Pressure Balance
  • Optional Pressure Pans

Make sure to have the information from the MHEA example home printed and available for your reference.

Use the links in the left-hand menu to access the lessons in this course.


ORNL Wx  |  Sitemap  |  System Check  |  Feedback  |  FAQ
© Oak Ridge National Laboratory, All Rights Reserved. new aws prod 7.3.33.